主桥(zhu qiao )main bridge

主桥(zhu qiao )main bridge


相关考题:

With UMS, when the engine room is unwatched will control the main engineA.the bridge officer on watchB.the chief engineerC.the duty engineerD.the duty motorman

If anything abnormal be found on the load change of main engine when the ship is entering in shallow waterway, before taking measures the engineer on duty should _______.A.stop main engine immediatelyB.ask the captain and the chief engineer's permission for stopping the engineC.inquire the bridge for the situation initiativelyD.stop engine and inform bridge

The part of the shipboard electrical system used to control the distribution of power to the branch circuits, is the ______.A.bridge control panelB.disconnect linksC.main switchboardD.governor relay box

驾驶台甲板()A、compass deckB、main deckC、bridge deckD、lower deck

桥梁建筑高度(qiao liang jian zhu gao du)construction height of bridge

引桥(yin qiao)approach bridge

容许建筑高度(rong xu jian zhu gao du)allowable construction height of bridge

桥位地质剖面图(qiao wei di zhi pou mian tu)geologic section drawing of bridge site

桥梁标准设计(qiao liang biao zhun she ji)standard design of bridge

桥位选择(qiao wei xuan ze) bridge site slection

露天甲板()A、main deckB、weather deckC、lower deckD、bridge deck

起居甲板()A、accommodation deckB、bridge deckC、main deckD、lower deck

Deck officers work on the ()(驾驶台甲板).A、bridge deckB、main deckC、compass deckD、weather deck

单选题If anything abnormal be found on the load change of main engine when the ship is entering in shallow waterway, before taking measuring the engineer on duty should ()Astop main engine immediatelyBask the captain and the chief engineer’s permission for stopping the engineCinitiatively inquire the bridge for the situationDstop engine and inform bridge

单选题With UMS, when the engine room is unwatched () will control the main engine.Athe bridge officer on watchBthe chief engineerCthe duty engineerDthe duty motorman

单选题When the order () is received from the bridge, the main air stop valve in the starting air line should be shut.Astand-by engineBfull aheadCfinished with engineDfull away

名词解释题桥位选择(qiao wei xuan ze) bridge site slection

名词解释题桥位地质剖面图(qiao wei di zhi pou mian tu)geologic section drawing of bridge site

名词解释题容许建筑高度(rong xu jian zhu gao du)allowable construction height of bridge

单选题Main diesel engine control can be obtained by the bridge ()Aat any timeBonly after the engine room control station is switched to ‘bridge control’Cwhenever the secondary station is switched to ‘bridge control’Dwhenever the engine side control station is switched to ‘bridge control’

名词解释题桥梁建筑高度(qiao liang jian zhu gao du)construction height of bridge

单选题The () of the main shaft should be measured with a ().Aclearance;calipersBsinking;bridge gaugeCdiameter;bridge gaugeDclearance;lead wire

名词解释题桥梁标准设计(qiao liang biao zhun she ji)standard design of bridge

名词解释题桥位地形图(qiao wei di xing tu )topography map of bridge site

名词解释题桥梁全长( qiao liang quan chang)total length of bridge

名词解释题引桥(yin qiao)approach bridge

名词解释题主桥(zhu qiao )main bridge