During a fire drill on a vessel, what action is required?()A、Start each fire pumpB、Launch and run a lifeboatC、Inspect fire hosesD、Close each fire pump

During a fire drill on a vessel, what action is required?()

  • A、Start each fire pump
  • B、Launch and run a lifeboat
  • C、Inspect fire hoses
  • D、Close each fire pump

相关考题:

When will the fire department come to conduct a fire prevention inspection in our company?A. Next month. I’ve checked hydrants and fire-extinguishers on each floorB.Next day. The manager will check hydrants and other equipment in the building.C.Next week. But hydrants and fire extinguishers on each floor has already been checkedD.The day before yesterday. I had already checked hydrants and fire extinguishers on each floor.

what is your position (station ) in the muster lists ,for example ,during the fire fighting ,abandon vessel ,oil pollution prevention etc ?

______ of the following statements is INCORRECT regarding a fire and boat drill on board your cargo vessel.A.At least one fire and boat drill shall be held within 24 hours of leaving a port where more than 25 percent of the crew has been replacedB.The Master is responsible in seeing that each lifeboat is lowered to the water at least once in each 6 months.C.Lifeboat equipment shall be examined at least once each month to insure that it is completeD.An entry shall be made in the vessel's Official Logbook relative to each fire and boat drill

A fire pump may be used for other purposes if ______.A.the other services are run off a reducing station with a pressure gageB.one of the required pumps is kept available for use on the fire main system at all timesC.no relief valves are installedD.all of the above conditions are met

A fire hose with a nozzle attached must be connected to each hydrant except when exposed to heavy weather or when the ______.A.Fire hose might be damaged by cargo operationsB.Vessel is in portC.Fire-main system is not chargedD.Fire pumps are used for purposes other than supplying water to the fire main

Fire protection regulations for towing vessels require all crew members to know how to perform each of these tasks EXCEPT ______.A.Start the mechanical ventilation system for the engine roomB.Operate the fuel shut-off for the engine roomC.Operate all fire extinguishing equipment aboard the vessel on board the vessel,including starting the fire pumpD.All of the above

During a fire drill on a vessel, what action is required? ______.A.Start each fire pump.B.Launch and run a lifeboat.C.Inventory rescue and fire equipment.D.Inspect fire hoses

消防泵()A、fire hose boxB、fire hydrantC、fire axeD、fire pump

关闭防火门()A、open fire doorsB、close fire doorsC、put on fire doorsD、put off fire doors

单选题During a fire drill on a vessel, what action is required?()AStart each fire pumpBLaunch and run a lifeboatCInspect fire hosesDClose each fire pump

单选题Fire protection regulations for towing vessels require all crew members to know how to perform each of these tasks EXCEPT().Astart the mechanical ventilation system for the engine roomBoperate the fuel shut-off for the engine roomCoperate all fire extinguishing equipment aboard the vessel on board the vessel,including starting the fire pumpDAll of the above

单选题What is the passage about?AThe Great Fire of London.BWho was the first to discover the fire?CWhat Pepys was doing during the fire.DThe losses caused by the fire.

单选题A fire and boat drill on a tank vessel shall, by regulation, include ().Astarting the fire pumpsBchecking firemans outfits and other personnel rescue equipmentCchecking relevant communications equipmentDAll of the above

单选题Each fire drill shall not include().AStarting of a fire pumpBReporting to stationsCPreparing for the duties described in the muster listDChecking of cargo handling equipment

单选题During a fire drill on a vessel,what action is required?().AStart each fire pumpBLaunch aand run a lifeboatCInventory rescue and fire equipmentDInspect fire hoses

单选题Each fire pump on a ship must have a pressure gauge located at().Athe pump dischargeBthe manifold connectionCeach fire station dischargeDthe pump station

单选题Weight is considered during the periodic required inspection and servicing of().ACO2 (carbon dioxide) fire extinguishersBfoam fire extinguishersCwater (stored pressure) fire extinguishersDAll of the above

单选题A fire pump may be used for other purposes if().Athe other services are run off a reducing station with a pressure gageBone of the required pumps is kept available for use on the fire main system at all timesCno relief valves are installedDall of the above conditions are met

单选题What is required in addition to the heat,fuel,and oxygen of the fire triangle to have a fire?()AElectricityBChain reactionCPressureDSmoke

单选题During the required periodic abandon ship drill aboard a ship,each person not assigned duties in the muster list is().Ainstructed in the use of portable fire extinguishersBshown a video demonstrating lifeboat launchingCinstructed in the use of life jacketsDnot required to attend the boat drill

单选题What shall be conducted during a fire and boat drill?()AAll watertight doors which are in use while the vessel is underway shall be operatedBAll lifeboat equipment shall be examinedCFire pumps shall be started and all exterior outlets openedDAll of the above

单选题()of the following statements is incorrect regarding a fire and boat drill ao board your cargo vessel.AAt least one fire and drill shall be held within 24 hours of leaving a port where more than 25 percent of the crew has been replacedBThe Master is responsible in seeing thst each lifeboat is lowered to the water at least once in each 6 monthsCLifeboat equipment shall be examined at least once each month to insure that it is completeDAn entry shall be made in the vessels official Logbook relative eo each fire and boat drill

单选题If not attached to the nozzle,each low-velocity spray applicator on a vessel must be stowed().Ain a protected area on the main deckBinside a machinery space near the entranceCnext to the fire hydrant to which the fire hose is attachedDon a rack inside the quarters near the entrance

单选题If you are fighting a fire below the main deck of your vessel,which action is most important concerning the stability of the vessel?().AShutting off electricity to damaged cablesBPumping fire-fighting water overboardCManeuvering the vessel so the fire is on the lee sideDRemoving burned debris from the cargo hold

单选题On a ship,a fire pump may be used for other purposes if().Athe other services are run off a reducing station with a pressure gageBa separate fire pump is available for use on the fire mainCall other services are operated by a manifold near the pumpDAll of the above

单选题If you are fighting a fire below the main deck of your vessel,which action is most importantconcerning the stability of the vessel? ()AShutting off electricity to damaged cablesBPumping fire-fighting water overboardCManeuvering the vessel so the fire is on the lee sideDRemoving burned debris from the cargo hold

单选题During a fire drill on a ship,what action is required?()AStart each fire pumpBLaunch and run a lifeboatCInventory rescue and fire equipmentDInspect fire hoses