deck red paint()A、甲板红漆B、船壳白漆C、船壳灰漆D、奶黄漆

deck red paint()

  • A、甲板红漆
  • B、船壳白漆
  • C、船壳灰漆
  • D、奶黄漆

相关考题:

________(油漆成)red,the building stands out among the rest and looks very attractive.(paint)

What should be done after putting down the ramp on a Ro-Ro vessel,prior to loading or discharging cargo ________.A.Turn on red cargo lightB.Turn on ventilation for cargo holdsC.Call out the deck department for all handsD.None of the above

The Coordinator Surface Search(CSS)in a SAR situation should display by night ______.A.Deck lights forward and aftB.A white light over two red lightsC.A red light,white light,and blue light in a vertical lineD.A distinctive signal promulgated by the CSS

我经常在艏楼做一些修理工作。()A、I usually keep watch on the bridge.B、I often do some repair work on the forecastle.C、I often paint on deck.D、I often do some repair work on the bridge.

Mark the joining shackles with ()paint.A、red/yellowB、yellow/blackC、red/whiteD、yellow/red

首楼甲板涂上两度红丹漆和干舷漆。()A、Apply two coats of red lead primer and topside paint to the forecastle deck.B、Apply two coats of red lead primer and boottopping paint to the forecastle deck.C、Apply two coats of topside paint and red lead primer to the poop deck.D、Apply two coats of red lead primer and topside paint to the poop deck.

In addition, the varnish is used to paint the woodworks and deck rails. ()A、另外,清漆用来油漆木制品和甲板扶手。B、同时,木匠的工作是上清漆和刷甲板扶手。C、再说,木器和甲板都要涂上清漆。D、另外,清漆用来油漆钢制品。

Paint is stowed in the paint ().A、cabinB、lockerC、roomD、deck

Topside paint is applied to the area of the ship’s ()which is out of water when the ship is loaded.A、hullB、cabinC、cargo holdD、deck

Apply two coats of ()(红丹漆) and topside paint to the forecastle deck.A、primerB、red lead paintC、undercoatD、top coat

Bridge deck, cabin doors and hand rails are usually coated with ().A、varnishB、white gloss paintC、bitumenD、paint

The varnish is used to paint the woodwork and deck ()(扶手).A、cargoB、railC、paintD、department

Which isn’t paint?()A、Red lead.B、Primer.C、Thinner.D、White paint.

水手长正在甲板上刮掉起皮的油漆。()A、The bosun is cleaning the heavy paint on deck.B、The bosun is scraping the heavy paint on deck.C、The bosun is scraping the loose paint on deck.D、The bosun is cleaning the loose paint on deck.

甲板分为艏楼甲板,主甲板和艉楼甲板。()A、The deck is divided into forecastle deck, main deck and poop deck.B、The deck is divided into forecastle deck, lower deck and main deck.C、The deck is divided into forecastle deck, main deck and lower deck.D、The deck is divided into main deck, lower deck and poop deck.

水泥涂料()A、red lead paintB、cement washC、bitumenD、anti-fouling paint

Apply two coats of red lead primer and topside paint ()the forecastle deck.A、forB、withC、toD、at

清扫艏艉甲板,准备出海。()A、Repair fore and aft decks and prepare for sea.B、Clean up lower deck and prepare for sea.C、Clean up fore and aft decks and prepare for sea.D、Paint fore and aft decks and prepare for sea.

单选题水手长正在甲板上刮掉起皮的油漆。()AThe bosun is cleaning the heavy paint on deck.BThe bosun is scraping the heavy paint on deck.CThe bosun is scraping the loose paint on deck.DThe bosun is cleaning the loose paint on deck.

单选题deck red paint()A甲板红漆B船壳白漆C船壳灰漆D奶黄漆

单选题Apply two coats of red lead primer and topside paint ()the forecastle deck.AforBwithCtoDat

单选题甲板分为艏楼甲板,主甲板和艉楼甲板。()AThe deck is divided into forecastle deck, main deck and poop deck.BThe deck is divided into forecastle deck, lower deck and main deck.CThe deck is divided into forecastle deck, main deck and lower deck.DThe deck is divided into main deck, lower deck and poop deck.

单选题Many fast food restaurants paint their walls red, play loud music and have hard seats ______customers eat quickly and leave.AmakeBto makeCmadeDmaking

单选题What would NOT require that a detailed report of the release of hazardous cargo be made to the Department of Transportation? ()AThe valve on an empty portable tank that contained acetone is accidently opened and some of the residue escapes to the open seaBA carboy of nitric acid is broken on deck while loading and is flushed overboard with no injuryor damageCPart of your deck cargo of five gallon cans of paint is damaged and leaking so you jettison them to eliminate the fire hazardDHeavy weather causes damage to packages of a hazardous liquid that is subsequently pumped out at sea through the bilge pumping system

单选题The varnish is used to paint the ()(木制品) and deck rail.AwoodworkBteamworkCcargo workDsteel work

单选题我们经常保养甲板机械。()AWe often maintain deck machinery.BWe often repair deck machinery.CWe often clean and paint deck.DWe often adjust deck machinery.

单选题You are loading a cargo that includes cylinders of acetylene aboard your break bulk vessel. Which statement is true? ()AThe cylinders must be stowed at least 10 horizontal feet from corrosive materials in the same spaceBStowage in the upper deck-deck is considered to be the equivalent of on deck stowage for this cargoCThe cylinders must have a red label for flammability and a green label for compressed gasDThe cylinders may be protected from the radiant heat of the Sun by laying a tarp on them