main switch room的中文意思是什么?

main switch room的中文意思是什么?


相关考题:

下面程序的运行结果为 include void main( ) {char a='3'; switch(a) { case'3': 下面程序的运行结果为#include<iostream.h>void main( ){char a='3';switch(a){case'3':cout < <"3";case'2':cout < < "2";break;default:cout < <"1";}}A.3B.321C.31D.32

以下程序段的运行结果是( )。 include main() {int x=2,y=1: switch(x) {case 1: switch 以下程序段的运行结果是( )。 include<stdio.h> main() {int x=2,y=1: switch(x) {case 1: switch(y) {case 0:printf("x=2,y=1\n");break; case 1:printf("y=1\n");break; } case 2:printf("x=2\n"); } }

以下程序的运行结果是( )。main()(int a=2,b=7,c=5;switch(a>0){case 1:switch(b<0){case 1:switch(");break;case 2:printf("!");break;}case 0:switch(c==5){case 0:printf("*");break;case 1:printf("");break;case 2:printf("$");break;}default:printf ("&");}printf("\n");}

main()方法的返回类型是( )。A.intB.byteC.switch语句D.For语句

有以下程序:includeusing namespace Std;int main(){ int a = 15,b = 21,m = 0; swit 有以下程序: #include <iostream> using namespace Std; int main( ) { int a = 15,b = 21,m = 0; switch(a%3) { case 0: m++; break; case 1: m++; switch(b%2) {A.1B.2C.3D.4

With UMS, when the engine room is unwatched will control the main engineA.the bridge officer on watchB.the chief engineerC.the duty engineerD.the duty motorman

The emergency generator or emergency battery is connected to _______on most large ships.A.distribution boardsB.section boardsC.emergency switch boardsD.main switch boards

有以下程序: include main() {int a=6,b=7,m=1;switch(a%2){ case 0:m++;break;case 1 有以下程序: #include<stdio.h> main() { int a=6,b=7,m=1; switch(a%2) { case 0:m++;break; case 1 :m++; switch(b%2) { defaut:m++; case0:m++;break; } } printf("%d\n",m); }A.1B.2C.3D.4

The main generators are connected to ______.A.distribution boardsB.section boardsC.emergency switch boardsD.main switch boards

Your vessel has a midships engine room and the cargo is concentrated in the end holds.The vessel is ______.A.sagging with tensile stress on main deckB.sagging with compressive stress on main deckC.hogging with tensile stress on main deckD.hogging with compressive stress on main deck

船舶的主体是船壳。()A、The main body of a vessel is the hull.B、The main body of a vessel is the superstructure.C、The main body of a vessel is the engine room.D、The main body of a vessel is the poop.

Switch变流器的故障列表中第78号故障是()A、Main fuse tripB、Gen unit faultC、Mainbreaker tripD、Genbreaker fault

A network administrator needs to add an additional connection to a room. The administrator adds a new Ethernet switch and must connect it to an existing switch. Which cable type should be used to connect the two switches?()A、CAT3 cableB、Serial cableC、Crossover cableD、Rollover cable

Ignition Switch的中文意思是()。

EFI Main Relay的中文意思是()。

Open in TRC brake main relay circuit的中文意思是()。

单选题船舶的主体是船壳。()AThe main body of a vessel is the hull.BThe main body of a vessel is the superstructure.CThe main body of a vessel is the engine room.DThe main body of a vessel is the poop.

单选题With UMS, when the engine room is unwatched () will control the main engine.Athe bridge officer on watchBthe chief engineerCthe duty engineerDthe duty motorman

单选题Your vessel has a midships engine room and the cargo is concentrated in the end holds.The vessel is().Asagging with tensile stress on main deckBsagging with compressive stress on main deckChogging with tensile stress on main deckDhogging with compressive stress on main deck

单选题The frequency of an alternator is controlled from the main switchboard by adjusting the()Afrequency meterBvoltage regulatorCgovernor controlDsychroscope switch

单选题Control of the main propulsion diesel engines can be shifted from the engine room to the wheelhouse from the ().Awheelhouse control stationBengine room control stationCcaptains officeDchief engineers office

单选题()are located on the road panel of main switchboard.AMegohm meter, insulation light and synchroscopeBSynchroscope, synchro light and megohm meterCShore power switch, insulation light and synchroscopeDMegohm meter, insulation light and shore power switch

单选题The main generators are connected to().Adistribution boardsBsection boardsCemergency switch boardsDmain switch boards

单选题After resolving the trouble of main power supply, main switch of emergency generator should(), if power supply is refreshed.Abe switched off by the duty officerBbe switched on by the duty officerCbe switched off automaticallyDbe switched on automatically

单选题Your vessel is equipped with a fixed C02 system and a fire main system. In the event of an electrical fire in the engine room what is the correct procedure for fighting the fire?().AUse the C02 system and evacuate the engine roomBUse the fire main system and evacuate the engine roomCEvacuate the engine room and use the C02 systemDEvacuate the engine room and use the fire main system

单选题()is not a part of the main switch board.AControl panel of main generatorBControl panel of emergency generatorCParalleling panelDLoad panel of main generator

单选题有如下程序:#include struct person{ char name[10]; int age;};main(){ struct person room[2] = {{Wang,19},{Li,20}}; printf(%s:%d,(room+1)-name, room-age);}程序运行后的输出结果是(  )。ALi:19BWang:19CLi:20DWang:17