单选题The purpose of sheer in ship construction is to().Aallow the ship to ride waves with drier decksBeliminate the need for butt strapsCeliminate the need for margin platesDgive greater strength at the deck edge

单选题
The purpose of sheer in ship construction is to().
A

allow the ship to ride waves with drier decks

B

eliminate the need for butt straps

C

eliminate the need for margin plates

D

give greater strength at the deck edge


参考解析

解析: 暂无解析

相关考题:

Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in ______.A.INTERNATIONAL LOADLINE CERTIFICATEB.PASSENGER SHIP SAFETY CERTIFICATEC.CARGO SHIP SAFETY CONSTRUCTION CERTIFICATED.GENERAL DECLARATION

______ is issued under the provision of International Convention for the Prevention of Pollution from Ships,1973,as modified by the Protocol of 1978 relating thereto.A.INTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATEB.CARGO SHIP SAFETY CONSTRUCTION CERTIFICATEC.CARGO SHIP SAFETY EQUIPMENT CERTIFICATED.CARGO SHIP SAFETY RADIOTELEPHONY CERTIFICATE

A claim for cargo damages may be held against the shipowner if such damage is the result of failure of the ship's officers to ______.A.ensure the fitness and safety of cargo spacesB.ensure adequate packaging of the cargoC.prevent delays due to quarantine restrictionsD.correct all defects in the ship's construction

What is the period of validity of the SOLAS required Cargo Ship Safety Construction Certificate?A.12 monthsB.24 monthsC.48 monthsD.60 months

A ship under construction or major repair will acquire permanent magnetism due to ______ while sitting stationary in the earth's magnetic field.A.hammering and jarringB.vibration and poundingC.varying magnetic fieldsD.stable or permanent magnetism of the ship

The most modern type of dry cargo carrier is().A、multi-purpose shipB、the container shipC、bulk carrierD、general cargo ship

Multi-purpose ship carries().A、not only general cargoB、but also bulk cargoC、A+ BD、Neither A nor B

单选题What is the period of validity of the SOLAS required Cargo Ship Safety Construction Certificate? ()A12 monthsB24 monthsC48 monthsD60 months

单选题The construction portfolio may be included as part of the ship().Ageneral plansBoperating manualCbuilders documentationDCCS file

单选题The most modern type of dry cargo carrier is().Amulti-purpose shipBthe container shipCbulk carrierDgeneral cargo ship

单选题Multi-purpose ship carries().Anot only general cargoBbut also bulk cargoCA+ BDNeither A nor B

单选题What is the purpose of Mr. Patil’s email?ATo thank the newspaper for its coverageBTo request that information be correctedCTo introduce his company to the newspaperDTo question the safety of a construction project

单选题In ship construction,bulkheads in the quarters are generally().AstructuralBwatertightCnon-structuralDcontinuous

单选题The purpose of lookout is to prove the ()(安全) of a ship.AsternBsafetyCsawDspanner

单选题Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in().AINTERNATIONAL LOAD LINE CERTIFICATEBPASSENGER SHIP SAFETY CERTIFICATECCARGO SHIP SAFETY CONSTRUCTION CERTIFICATEDGENERAL DECLARATION

单选题What is the purpose of the memo?ATo communicate a change in meeting arrangementsBTo request the relocation of a company eventCTo discuss the details of some construction workDTo notify a manager of an upcoming staff reduction

单选题()is a roud-shaped underwater part in the front of the ship.The purpose is to cre-ate less friction with water so that the ship moves more easily.AThe bulbous bowBThe anchorCThe bow thrusterDThe propeller

单选题()is issued under the provision of International Convention for the Prevention of Pollution from Ships,1973,as modified by the Protocol of 1978 relating thereto.AINTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATEBCARGO SHIP SAFETY CONSTRUCTION CERTIFICATECCARGO SHIP SAFETY EQUIPMENT CERTIFICATEDCARGO SHIP SAFETY RADIOTELEPHONY CERTIFICATE

单选题The bulk carrier, general cargo ship, reefer ship and lumber carrier are all ().Aliquid cargo shipsBmulti-purpose shipsCdry cargo shipsDcontainer ships

单选题散货船()Ageneral cargo shipBcontainer shipCbulk carrierDmulti-purpose ship

单选题A ship under construction or major repair will acquire permanent magnetism due to()while sitting stationary in the earth’s magnetic field.Ahammering and jarringBvibration and poundingCvarying magnetic fieldsDstable or permanent magnetism of the ship

单选题A claim for cargo damages may be held against the shipowner if such damage is the result of failure of the ship’s officers to().Aensure the fitness and safety of cargo spacesBensure adequate packaging of the cargoCprevent delays due to quarantine restrictionsDcorrect all defects in the ship's construction

单选题The main purpose of port State control is not to()Aprevent an unsafe ship proceeding to seaBprevent a ship threatening the marine environmentCfine the shipsDconfirm a safe sailing

单选题The line-throwing appliance provided on board ship is().Afor the saving of lifeBfor fire-fightingCfor mooring purposeDfor towing purpose

单选题A simplified construction plan may be included in the ship construction portfolio provided it adequately defines the().Aareas where special materials are usedBhazardous areasClocation of emergency repair equipmentDtype and strength of materials used

单选题The purpose of PSC is ()Ato check and inspect foreign shipsBto verify the condition of a ship in compliance with requirements of international conventionsCto fine shipsDto detain ships

单选题The purpose of sheer in ship construction is to().Aallow the ship to ride waves with drier decksBeliminate the need for butt strapsCeliminate the need for margin platesDgive greater strength at the deck edge

单选题Where is thicker plating usually found in the construction of integral tanks on a ship? ()AOn the outside of the tankBAt the bottom of the tankCAt the top of the tankDAt the center of the tank