问答题公共交通尚不能应付迅速发展的旅游业。(boom)
问答题
公共交通尚不能应付迅速发展的旅游业。(boom)
参考解析
解析:
迅速发展的旅游业可以用词组travel boom表示,travel的用法为名词作定语。
应付:cope with。公共交通:public transport。
迅速发展的旅游业可以用词组travel boom表示,travel的用法为名词作定语。
应付:cope with。公共交通:public transport。
相关考题:
On a crane, the boom indicator tells the operator what angle the boom angle is compared to the ______.A.vertical positionB.horizontal positionC.boom stop angleD.minimum radius angle
The boom stops are installed on an offshore crane to ______.A.prevent the boom from being raised too highB.prevent the boom from swingingC.support the boom when not in useD.prevent the boom from being lowered
With a given load on the cargo hook,tension in a single span topping lift ______.A.increases as the boom's angle to the horizontal increasesB.is at a maximum when the boom is at a 45° angle to the horizontalC.increases as the boom's angle to the horizontal decreasesD.decreases as the boom's angle to the horizontal decreases
With a given load on the cargo hook,the thrust on a cargo boom ______.A.increases as the angle to the horizontal increasesB.increases as the angle to the horizontal decreasesC.is greatest at an angle of 45° and decreases as the boom is raised or loweredD.is least at an angle of 45° and increases as the boom is raised or lowered
The boom stops on a pedestal crane prevent the boom from ______.A.being raised too highB.swinging at seaC.overloading when not in useD.being lowered too low
The boom indicator on a crane will indicate the ______.A.Length of the boomB.Angle of the boomC.Lifting capacity of the boomD.Direction of the boom
What is meant by the term“luffing the boom”of a crane ________.A.Stopping the boomB.Topping or lowering the boomC.Moving the boom left or rightD.All of the above
A boom vang ______.A.holds the boom down and flattens the main sailB.draws the head of the sail to windwardC.tautens the standing riggingD.douses the gaff topsail
ASP(音频控制面板)的正常位置是()A、MASK/BOOM开关在BOOM位;ALT/NORM开关在NORM位B、MASK/BOOM开关在MASK位;ALT/NORM开关在NORM位C、MASK/BOOM开关在MASK位;ALT/NORM开关在ALT位D、MASK/BOOM开关在BOOM位;ALT/NORM开关在ALT位
单选题For a given weight of cargo,the stress on the heel block of a cargo boom().Aincreases as the cargo closes the head while hoistingBincreases if the cargo runner is doubled upCdecreases as the boom is topped to a greater angleDis determined by the thrust stresses on the boom
单选题What is meant by the term TOPPING THE BOOM?()ALowering the boomBRaising the boomCSpotting the boom over the deckDSwinging the boom athwartships
单选题The boom stops on a pedestal crane prevent the boom from().Abeing raised too highBswinging at seaCoverloading when not in useDbeing lowered too low
单选题A boom vang().Aholds the boom down and flattens the main sailBdraws the head of the sail to windwardCtautens the standing riggingDdouses the gaff topsail
单选题With a given load on the cargo hook,the thrust on a cargo boom().Aincreases as the angle to the horizontal increasesBincreases as the angle to the horizontal decreasesCis greatest at an angle of 45° and decreases as the boom is raised or loweredDis least at an angle of 45° and increases as the boom is raised or lowered
单选题With a given load on the cargo hook,tension in a single span topping lift().Aincreases as the boom's angle to the horizontal increasesBis at a maximum when the boom is at a 45° angle to the horizontalCincreases as the boom's angle to the horizontal decreasesDdecreases as the boom's angle to the horizontal decreases
单选题0n a crane ,the boom indicator tells the operator what angle the boom angle is compared to the().Avertical positionBhorizontal positionCboom stop angleDminimum radius angle
单选题The boom stops are installed on an offshore crane to().Aprevent the boom from being raised too highBprevent the boom from swingingCsupport the boom when not in useDprevent the boom from being lowered
单选题The boom indicator on a crane will indicate the().Alength of the boomBangle of the boomClifting capacity of the boomDdirection of the boom