问答题承包方按中标价固定方式包死的方式承包,当市场和施工环境发生较大变化,如钢材大幅度上涨,但发包方不同意调整材料差价,承包方能否按“情势变更原则”追加价格?
问答题
承包方按中标价固定方式包死的方式承包,当市场和施工环境发生较大变化,如钢材大幅度上涨,但发包方不同意调整材料差价,承包方能否按“情势变更原则”追加价格?
参考解析
解析:
暂无解析
相关考题:
多选题根据合伙企业法律制度的规定,合伙企业存续期间,下列行为中,必须经全体合伙人一致同意的有( )A合伙人之间转让其在合伙企业中的财产份额B合伙人向合伙人以外的人转让其在合伙企业中的财产份额C合伙人以其在合伙企业中的财产份额出质D执行合伙企业事务的合伙人向企业登记机关申请办理变更登记手续
单选题Your network consists of a single Active Directory domain. All domain controllers run Windows Server 2008 R2 and are configured as DNS servers. A domain controller named DC1 has a standard primary zone for contoso.com. A domain controller named DC2 has a standard secondary zone for contoso.com. You need to ensure that the replication of the contoso.com zone is encrypted. You must not lose any zone data. What should you do()AOn both servers, modify the interface that the DNS server listens on.BConvert the primary zone into an Active Directory-integrated zone. Delete the secondary zone.CConvert the primary zone into an Active Directory-integrated stub zone. Delete the secondary zone.DConfigure the zone transfer settings of the standard primary zone. Modify the Master Servers lists on the secondary
单选题某一跨年度施工的项目,在项目实施的第一个冬季由于遭遇气候问题造成了进度延迟。而所有当地的相关方都说这种气候是该区域的典型气候条件。为了将该信息整合到项目进度计划内,项目经理应该如何做?()A延长计划于明年冬季实施的所有活动的持续时间B对修改的进度计划进行重新评估,确定潜在的影响C对现有的进度计划不做任何修改,等到明年遇到问题时,再采取措施D对项目计划进行修改,以便维持现有的项目进度计划
单选题企业平时发现现金短款,在查明原因处理之前,应在以下科目核算。()A其他应收款B其他应付款C管理费用D财务费用