多选题社会主义的政治制度必须()A坚持共产党领导和无产阶级的专政B实行民主集中制的政治体制C人民当家作主D依法治国E发展社会主义民主政治
多选题
社会主义的政治制度必须()
A
坚持共产党领导和无产阶级的专政
B
实行民主集中制的政治体制
C
人民当家作主
D
依法治国
E
发展社会主义民主政治
参考解析
解析:
暂无解析
相关考题:
单选题When the clverify utility is run,verification checks use ODM data provided by the common communication infrastructure. This provides efficient access to configuration ODMs from the other nodes. The utility manages these files by storing the copies in various directories depending on the success or failure of the verification pass. By default,this directory is "/var/hacmp/clverify/current/nodename/ if the ’current’ directory still exists when clverify stops running,this indicates which of the following?()A A successful completion of clverifyB A problem with the clverify utilityC All nodes agree on active configurationD Configuration differences between current and last successful clverify
问答题某公司中标某工程,根据《建设工程施工合同(示范文本)》(GF一2013―0201)与建设单位签订总承包施工合同。按公司成本管理规定,首先进行该项目成本预测(其中:人工费287.4万元,材料费504.5万元,机械使用费155.3万元,施工措施费104.2万元,施工管理费46.2万元,税金30.6万元),然后将成本预测结果下达给项目经理部进行具体施工成本管理。总承包施工合同是以工程量清单为基础的固定单价合同,合同约定当A分项工程、B分项工程实际工程量与清单工程量差异幅度在±5%以内的按清单价结算,超出幅度大于5%时按清单价的0.9倍结算,减少幅度大于5%时按清单价的1.1倍结算(具体参数如下表所示)。合同单价与工程量统计表 总承包施工合同中还约定C分项工程为甲方指定专业分包项目,C分项工程施工过程中发生了如下事件: 事件一:由于建设单位原因,导致C分项工程停工7日,专业分包单位就停工造成的损失向总承包单位提出索赔。总承包单位认为由于建设单位原因造成的损失,专业分包单位应直接向建设单位提出索赔。 事件二:甲方指定专业分包单位现场管理混乱、安全管理薄弱,建设单位责令总承包单位加强管理并提出整改,总承包单位认为C分项工程施工安全管理属专业分包单位责任,非总承包单位责任范围。 事件三:C分项工程施工完毕并通过验收,专业分包单位向建设单位上报C分项工程施工档案,建设单位通知总承包单位接收。总承包单位认为C分项工程属甲方指定专业分包项目,其工程档案应直接上报建设单位。指出事件一、二、三中总承包单位说法中的不妥之处,并分别说明理由或给出正确做法。
多选题接收国际集装箱邮件的正确处理手续有()。A会同原寄邮政和港务双方验看封志是否完好B根据CN37路单内容进行点收C发现有袋数不符等情况应在CN37路单上批注D如果封志和集装箱外形完好,但内装邮件有短少情况,应向船方提出补偿责任
多选题工资的职能包括()。A保障职能B补偿、增殖职能C激励职能D调节职能E统计和监督职能