单选题In ship construction,frame spacing is().Agreater at the bow and sternBreduced at the bow and sternCuniform over the length of the vesselDuniform over the length of the vessel,with the exception of the machinery spaces,where it is reduced due to increased stresses

单选题
In ship construction,frame spacing is().
A

greater at the bow and stern

B

reduced at the bow and stern

C

uniform over the length of the vessel

D

uniform over the length of the vessel,with the exception of the machinery spaces,where it is reduced due to increased stresses


参考解析

解析: 暂无解析

相关考题:

The trend nowadays is to build the frame box as a separate fabricated construction and then, after stress relieving and machining the mating surfaces, to mount it on the _____. This has the advantage of saving weight.A.seatingB.bed-plateC.entablatureD.cylinder block

请完善程序(程序文件名:Java_3.java)并进行调试。请在下画线处填入正确内容,然后删除下画线。请勿删除注释行和其他已有的语句内容。[题目要求]生成下面左边图形界面,单击图中的New按钮,弹出如右图所示的对话框。源程序:import java.awt.*;import java.awt.event.*;import javax.swing.*;public class Java_3 {public static void main(String[] args) {MulticastFrame. frame=new MulticastFrame();frame.setDefaultCloseOperation(JFrame.EXIT_ON_CLOSE);frame.show();}}class MulticastFrame. extends JFrame. {public MulticastFrame() {setTitle("MulticastTest");setSize(WIDTH,HEIGHT);MulticastPanel panel=new MulticastPanel();Container contentPane=getContentPane();contentPane.add( (1) );}public static final int WIDTH=300;public static final int HEIGHT=200;}class MulticastPanel extends JPanel }public MulticastPanel() {JButton newButton=new JButton("New");add(newButton);ActionListener newListener=new ActionListener() {public void actionPerformed(ActionEvent event) {makeNewFrame();}};newButton.addActionListener(newListener);closeAllButton=new JButton("Close all");add(closeAllButton);}private void makeNewFrame() {final BlankFrame. frame=new BlankFrame();frame.show();ActionListener closeAllListener=new ActionListener() {public void actionPerformed(ActionEvent event) {frame. (2) (); //使窗口隐藏或消除}};closeAllButton.addActionListener( (3) );}private JButton closeAllButton;}Class BlankFrame. extends JFrame. {public BlankFrame() {(4) ++;setTitle("Frame"+counter);setSize(WIDTH,HEIGHT);setLocation(SPACING*counter,SPACING*counter);}public static final int WIDTH=200;public static final int HEIGHT=150;public static final int SPACING=30;private static int counter=0;}

Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in ______.A.INTERNATIONAL LOADLINE CERTIFICATEB.PASSENGER SHIP SAFETY CERTIFICATEC.CARGO SHIP SAFETY CONSTRUCTION CERTIFICATED.GENERAL DECLARATION

______ is issued under the provision of International Convention for the Prevention of Pollution from Ships,1973,as modified by the Protocol of 1978 relating thereto.A.INTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATEB.CARGO SHIP SAFETY CONSTRUCTION CERTIFICATEC.CARGO SHIP SAFETY EQUIPMENT CERTIFICATED.CARGO SHIP SAFETY RADIOTELEPHONY CERTIFICATE

In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the ______.A.chemical and physical properties of the materialB.name of the alternative standard or specificationC.the ASTM or ABS specification the material approximatesD.manufacturer or origin of the material

A claim for cargo damages may be held against the shipowner if such damage is the result of failure of the ship's officers to ______.A.ensure the fitness and safety of cargo spacesB.ensure adequate packaging of the cargoC.prevent delays due to quarantine restrictionsD.correct all defects in the ship's construction

What is the period of validity of the SOLAS required Cargo Ship Safety Construction Certificate?A.12 monthsB.24 monthsC.48 monthsD.60 months

Floors aboard ship are ______.A.frames to which the tank top and bottom shell are fastened on a double bottomed shipB.transverse members of the ships frame which support the decksC.longitudinal beams in the extreme bottom of a ship from which the ship's ribs startD.longitudinal angle bars fastened to a surface for strength

A ship under construction or major repair will acquire permanent magnetism due to ______ while sitting stationary in the earth's magnetic field.A.hammering and jarringB.vibration and poundingC.varying magnetic fieldsD.stable or permanent magnetism of the ship

车头间距(Spacing)

单选题In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().Achemical and physical properties of the materialBname of the alternative standard or specificationCthe ASTM or ABS specification the material approximatesDmanufacturer or origin of the material

单选题What is the period of validity of the SOLAS required Cargo Ship Safety Construction Certificate? ()A12 monthsB24 monthsC48 monthsD60 months

单选题The construction portfolio may be included as part of the ship().Ageneral plansBoperating manualCbuilders documentationDCCS file

单选题Floors aboard ship are().Aframes to which the tank top and bottom shell are fastened on a double bottomed shipBtransverse members of the ships frame which support the decksClongitudinal beams in the extreme bottom of a ship from which the ships ribs startDlongitudinal angle bars fastened to a surface for strength

单选题Floors aboard ship are().Aframes to which the tank top and bottom shell are fastened on a double bottomed shipBtransverse members of the ships frame which support the decksClongitudinal beams in the extreme bottom of a ship from which the ship's ribs startDlongitudinal angle bars fastened to a surface for strength

单选题Which one is not true?()ATwo main areas of skill are involved in the construction of shipBThere are distinct divisions in responsibilities between naval architects and marine engineersCEach ship will assume varying proportions according to its typeDShips can be divided into different categories from different perspectives

单选题In preparing a cargo space for receipt of a shipment of bagged cargo,which instruction for laying dunnage should be followed? ()AUse either 1 or 2 tiers of dunnage,spacing the pieces in each tier a foot apart,and lay pieces in the bottom tier diagonally to the ship's sideBUse 1 tier of dunnage,laying the pieces tightly together to form a solid floor over the steel deckCUse 2 tiers of dunnage,spacing the pieces in the bottom tier about a foot apart and the pieces in the top tier 6 inches apartDUse 2 tiers of dunnage,spacing the pieces in the bottom tier about a foot apart and the pieces in the top tier together

单选题In ship construction,bulkheads in the quarters are generally().AstructuralBwatertightCnon-structuralDcontinuous

单选题Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in().AINTERNATIONAL LOAD LINE CERTIFICATEBPASSENGER SHIP SAFETY CERTIFICATECCARGO SHIP SAFETY CONSTRUCTION CERTIFICATEDGENERAL DECLARATION

单选题The trend nowadays is to build the frame box as a separate fabricated construction and then, after stress relieving and machining the mating surfaces, to mount it on the ().This has the advantage of saving weight.AseatingBbedplateCentablatureDcylinder block

单选题()is issued under the provision of International Convention for the Prevention of Pollution from Ships,1973,as modified by the Protocol of 1978 relating thereto.AINTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATEBCARGO SHIP SAFETY CONSTRUCTION CERTIFICATECCARGO SHIP SAFETY EQUIPMENT CERTIFICATEDCARGO SHIP SAFETY RADIOTELEPHONY CERTIFICATE

单选题A ship under construction or major repair will acquire permanent magnetism due to()while sitting stationary in the earth’s magnetic field.Ahammering and jarringBvibration and poundingCvarying magnetic fieldsDstable or permanent magnetism of the ship

单选题A claim for cargo damages may be held against the shipowner if such damage is the result of failure of the ship’s officers to().Aensure the fitness and safety of cargo spacesBensure adequate packaging of the cargoCprevent delays due to quarantine restrictionsDcorrect all defects in the ship's construction

单选题A simplified construction plan may be included in the ship construction portfolio provided it adequately defines the().Aareas where special materials are usedBhazardous areasClocation of emergency repair equipmentDtype and strength of materials used

单选题In ship construction,frame spacing is().Agreater at the bow and sternBreduced at the bow and sternCuniform over the length of the vesselDuniform over the length of the vessel,with the exception of the machinery spaces,where it is reduced due to increased stresses

单选题The purpose of sheer in ship construction is to().Aallow the ship to ride waves with drier decksBeliminate the need for butt strapsCeliminate the need for margin platesDgive greater strength at the deck edge

单选题Where is thicker plating usually found in the construction of integral tanks on a ship? ()AOn the outside of the tankBAt the bottom of the tankCAt the top of the tankDAt the center of the tank

单选题A “liner” in riveted construction of a vessel is a(n) ().Asmall plate which fills the aperture between riveted strakes and the vessel framingBbacking plate which is used to level the strakes while riveting,and then removedCinternal frame to which the side shell is rivetedDseam that is welded after riveting is completed